Traffic Alerts For The Upcoming Work Week

SHENANDOAH COUNTY 

INTERSTATE 81

Mile marker 263 to 276, northbound and southbound – Overnight and early morning lane closures as needed for installation of rumble strips, 10 p.m. October 20 to 9 a.m. October 21.

(NEW) Mile marker 265 to 264, southbound – Shoulder closures for inspection of bridge over Route 211. October 22 from 8 a.m. to 5 p.m.

(NEW) Mile marker 270 to 271, northbound – Shoulder closure for inspection of Route 720 bridge. October 22 from 8 a.m. to 5 p.m.

Mile marker 283 to 284, northbound – Single lane closures for bridge maintenance to Route 816 overpass. 8 p.m. to 7 a.m. through October 26’’

FREDERICK COUNTY

 

INTERSTATE 81

(UPDATE) Mile marker 306 to 319, northbound and southbound – Shoulder closures for sign installations at various locations, 9 a.m. to 3 p.m. through November 9.

(NEW) Mile marker 318 to 317, southbound – Overnight lane closures as needed for bridge work over Route 11 at exit 317. October 22 to November 2 from 8 p.m. to 7 a.m.

PRIMARY ROADS

Route 11 (Martinsburg Pike) – Northbound right shoulder closure for pavement marking from Winchester northern city limit to end of divided highway (2 miles north of Winchester), 7 a.m. to 5 p.m. through December 31.

Route 37, northbound and southbound – Overnight lane closures for bridge work over W&W Railroad near Winchester northern city limits, 7 p.m. to 7 a.m. through October 26.

Route 50, eastbound and westbound – Right lane closures at various locations for guardrail work, 6 a.m. to 8 p.m. through October 31.

(NEW) Route 522 – Shoulder closures for signal work at Route 654 (Cedar Grove Road) intersection. October 22-25 from 7 a.m. to 6 p.m.

(NEW) Route 522, northbound – Mobile lane closures for installation of rumble strips from Route 340 (Lord Fairfax Highway) to Route 644 (Parkins Mill Road). October 25-26 from 7 a.m. to 6 p.m.

PRIMARY ROADS

(NEW) Route 7 (Harry Byrd Highway) – Alternating lane closures between Route 7 Business and Route 615 (Boom Road) for inspection of bridges over Norfolk Southern railroad. October 26 from 8 a.m. to 6 p.m.

Route 7, eastbound – Alternating lane closures for paving between Route 660 (Honey Lane) and Route 7 Business (Main Street, Berryville), 9 a.m. to 5 p.m. through October 31.

Route 50, westbound – Left lane closures between Route 601 (Blue Ridge Mountain Road) and Summer Springs Lane for guardrail work, 6 a.m. to 8 p.m. through October 31.

Route 50, westbound – Overnight alternating lane closures for paving between Route 255 and Frederick County line, 8 p.m. to 7 a.m. through October 23.

Route 340, southbound – Right lane and shoulder closures in area of Route 623 (Gaylord Road) for guardrail work, 6 a.m. to 8 p.m. through October 31.


Sponsored Content

Sponsored Content